Location: Boulder, CO
Involvement: General Contractor, Master Builder,
Project Manager
Description: Steel, conventional frame, truss roof.
Pre-constuction started in May 2015.
Square Feet: 9,334 sq/ft finished, 13,743 sq/ft total
Architect: Jane Snyder | Mosaic Architects Boulder, CO
Interior Design: Miranda Cullen | Duet Design Group
Denver, CO
Start: We broke ground the week before Christmas of 2015
Completion: February 2018
As Featured In:
• LUXE Daily: Architecture & Design, September 2019
Location: Avon, CO
Involvement: General Contractor, Master Builder,
Project Manager
Description: Conventional frame, Cut-roof
Square Feet: 6,793 sq/ft finished, 7,719 sq/ft total
Architect: Brent Alm | Alm Architects, Vail, CO
Interior Design: Associates III, Denver, CO
Start: Sept 2010
Finish: June 2012
Location: Boulder, CO
Involvement: General Contractor, Master Builder,
Project Manager, Owner, Developer
Description: Addition and remodel of this beautiful 1939 brick home.
Square Feet: 4,066 sq/ft finished, 5,066 sq/ft total
Architect: Kirk Aker | Aker Architects, Edwards, CO
Interior Design: Kirk Aker | Aker Architects, Edwards, CO
Start: Oct 2010
Finish: June 2011
Location: Boulder, CO
Involvement: General Contractor, Master Builder,
Project Manager, Development, Partner
Description: Conventional frame, truss roof
Square Feet: 5,418 sq/ft finished, 6,651 sq/ft total
Architect: Kirk Aker | Aker Architects, Edwards, CO
Interior Design: Kirk Aker | Aker Architects, Edwards, CO
Start: Feb 2010
Finish: June 2011
Location: Boulder, CO
Involvement: General Contractor, Master Builder,
Project Manager, Development Partner
Description: Conventional frame, cut roof
Square Feet: 6,357 sq/ft finished, 7,640 sq/ft total
Architect: Kirk Aker | Aker Architects, Edwards, CO
Interior Design: Kirk Aker | Aker Architects, Edwards, CO
Start: June 2009
Finish: January 2010
Location: Boulder, CO
Involvement: Development Partner
Description: Addition & remodel of an early 1900's home
Square Feet: 5,275 sq/ft finished, 6,154 sq/ft total
Architect: Karen Dixon | D2 Studio Boulder, CO
Interior Design: A collaborative effort of Dwell Corp,
the development group
Start: February 2008
Finish: August 2009
Location: Eagle, CO
Involvement: General Contractor, Master Builder,
Project Manager
Description: Conventional & steel frame with a 12 car underground garage
Square Feet: 1,793 sq/ft finished, 5,781 sq/ft total
Architect: Kirk Aker | Aker Architects, Edwards, CO
Interior Design: Kirk Aker | Aker Architects, Edwards, CO
Start: November 2006
Finish: November 2008
Location: Anguilla, British Caribbean
Involvement: Owner Representative
Description: A 5,300 sq/ft home with an additional 5,500 sq/ft of patios on the ocean at the Cuisinart Golf Resort and Spa, formerly the Temeno's Resort. My involvement started in January of 2006 and finished in April of 2007.
Architect: Glover Smith Bode
Location: Eagle, CO
Involvement: General Contractor, Master Builder,
Project Manager
Description: Wood/timber/steel frame with an outdoor lap pool
Square Feet: 7,110 sq/ft finished, 8,990 sq/ft total
Architect: Kirk Aker | Aker Architects, Edwards, CO
Interior Design: Our Client + Kirk Aker | Aker Architects,
Edwards, CO
Furnishings: Shari Levine | Design Forum, Boca Raton, FL
Start: August 2003
Finish: March 2005
Location: Eagle, CO
Involvement: Design Development, General Contractor, Master Builder, Project Manager
Description: I was asked to build this small guest house and a sports barn after completing the clients main house. The property sat near the old stage road between Eagle and Leadville and there were several old structures still standing along the route, including a school house, a stage stop and several cabins. The concept for the guest home was to have the the main part of the structure look like the original log home with additions that were added as the family grew and time passed.
Square Feet: 1,930 sq/ft total
Architect: Emil Tanner | emildesigns, Boulder, CO
Interior Design: Manuel DeSantaren | Muse Group,
Boston, MA
Start: March 2003
Finish: March 2004
Location: Eagle, CO
Involvement: Master Builder, Project Manager
Description: The clients for this project were a family of six who had bought land in the Vail Valley and retained their architect who had built their family home in Massachusetts. They interviewed several builders looking for a builder who not only had extensive log home experience but who they felt would be a good fit. They selected Trends West, Inc who I was working with at the time.
Square Feet: 16,360 sq/ft finished, 18,500 sq/ft total
Architect: Peter Thomas | Mt Vernon Group,
Stoneham, MA
Interior Design: Manuel DeSantaren | Muse Group,
Boston MA
Start: April 2000
Finish: December 2001
Locations: Boulder, and Boulder County, Colorado
Dates: May 2018 through August 2023
Involvement: Design, General Contractor, Master Builder, Project Manager.
Description: Completed (6) projects for family and friends. Extensive remodels and additions, including an in-ground swimming pool with a hot tub and an indoor climbing wall.
Costs: Costs ranged from $150K to $1.2M